Froomsgate House, Bristol
This project involved a full perimeter access scaffold designed around the building, with only the upper lifts boarded to focus access where it was needed for high-level roof cladding repairs. The arrangement reduced material and dead load at lower levels while still providing a stable, fully tied structure up to the working height. Our design package included clear GA drawings and calculations to verify load paths, tie strategy, and overall stability for the repair sequence.
Need a Scaffold Design? Get in touch today by email or phone to discuss your project and required submission information.