Ebley Mill
Access scaffold to full perimeter of old mill building for a conversion. The rear elevations was particularly challenging due to an existing light weight roof below that wasn’t load bearing so we designed cantilevered support out of the windows with longitudinal beams over the top to support the main access scaffold above.
Need a Scaffold Design? Get in touch today by email or phone to discuss your project and required submission information.